14 AGO - 16 AGO

miércoles, 31 de julio de 2013

HOY


Avisamos que hoy recebamos el collar alrededor de los greenes. Ademas empezamos a levantar una zona sin cesped en la calle 2 para tepear. 
Rogamos disculpen las molestias.


Today we are top dressing greens surrounds. Also we are preparing to sod a big area on hole 2 to be sodded.
Sorry for the possible inconviniences 

jueves, 11 de julio de 2013

CONTROL DE PICUDO ROJO EN PALMERAS Y COCHINILLA EN CALODENDROS ---- RED PALM WEEVIL AND CAPE CHESTNUT BLACK SCALE CONTROL




El picudo rojo Rhynchophorus ferrugineus ha pasado a ser una de las más peligrosas plagas para las palmeras españolas, en particular para las especies Phoenix canariensis y en menor medida Phoenix dactilifera. Lo que comenzó siendo un pequeño foco producto de la importación de palmeras de Egipto, se ha convertido en la muerte de gran cantidad de especímenes en casi toda la geografía española.

Parte de dificultad de su control estriba en la falta de predadores naturales. En la actualidad se recomienda, además de un conjunto de medidas culturales, la realización de tratamientos químicos preventivos y la colocación de trampas para su conteo y erradicación.

La cochinilla de la tizne Saissetia oleae es una plaga habitual en los olivos, aunque puede atacar otras especies en especial si se encuentran cerca de olivos afectados. Este insecto se caracteriza por que el adulto forma una escama bajo el abrigo del cual se desarrollan los huevos y gusanos, siendo muy difícil el tratamiento químico. En muchos casos el insecto produce una melaza que cae sobre ramas y hojas más bajas y sobre la que se alimenta un hongo llamado negrilla, de ahí el nombre de tizne. Si bien el hongo no es parasito de la planta, puede ahogarla al cubrir su epidermis.

Para controlar este insecto es necesario esperar al momento en que los pequeños gusanos han salen de su protección y son susceptibles a los insecticidas de contacto.

Para el control de estas plagas Real Club de Golf Las Brisas cuenta con la colaboración de empresas que realizan los tratamientos periódicamente.

Les informamos que el próximo martes y miércoles 16-17 de Julio permanecerán cerrados 9 hoyos hasta media mañana para poder realizar el tratamiento de palmeras y calodendros de medio campo cada día. Tendrán más detalles en Tienda.

Disculpe las molestias.



The red palm weevil Rhynchophorus ferrugineus has become one of the most difficult pests for the Spanish palm trees, particularly for the canary palm and to a lesser extent to the date palm. What began as a small focus from some imported palms from Egypt has turned to be the end for thousands of specimens along the Spanish geography.

Control has been ineffective due to the lack of natural predators. At present it is recommended, in addition to a set of cultural practices, the use of a preventive insecticide program along with the installation of traps for eradication and scouting.

The black olive tree scale Saissetia oleae is a typical pest in olive trees, but it could infect other species if they are located close to affected olive trees. This insect is known because the adult females become a scale attached to the leaves. They lay eggs that stay under the female scale, until worms are of a good size to leave their shelter. It is very difficult to reach these worms with an insecticide then. This insect secretes molasses that falls over lower leaves and branches. A black fungus uses it for food. Even though this fungus is not a parasite, it could cover and suffocate some leaves.
In other to apply a contact insecticide it is necessary that worms have left their shelter, which normally occurs in june-july.

To control these pests Real Club de Golf Las Brisas has the support of professional companies doing regular treatments.

Please note that on Tuesday and Wednesday 16-17th of July, 9 holes will be closed each day until mid-morning to spray palm trees and cape chestnuts. You may get more details in the proshop.

Sorry for the inconvenience.

Rafael González-Carrascosa Bassadone
Director de Campo

miércoles, 3 de julio de 2013

CONTROL DEL KIKUYU EN CALLES - KIKUYU CONTROL ON FAIRWAYS

Control de Kikuyu en calles

En un intento de controlar esta mala hierba invasiva en las calles de los nueve primeros hoyos, se realizará una aplicación de herbicida esta semana.

Este herbicida no solo controla esta mala hierba sino que también mata el raigrás, el tipo de césped usado  este invierno en la resiembra de las calles. Este hecho tiene dos implicaciones:

·       El herbicida podría ser arrastrado por las ruedas de los buggies desde las calles al rough, dejando huellas de raigrás muerto en el rough.  Esto significa que los hoyos tratados deben ser cerrados al paso de buggies durante un día después del tratamiento. Por favor siga las indicaciones de las señales. (Miércoles hoyos 1, 5 y 8; Jueves hoyos 2, 3 y 6)
·       Aunque la bermuda está bien establecida en las calles, aun queda mucho raigrás de la resiembra vivo que morirá repentinamente tras el tratamiento, dejando un aspecto marrón hasta que la bermuda tome su lugar. Además, sabemos que hay varias zonas con poca bermuda porque no se plantó a tiempo en la pasada reforma. Estas áreas se quedarán desnudas y necesitarán que sean tepeadas pronto.

Esto es parte de nuestro programa de herbicidas para mantener nuestro césped limpio. Pedimos disculpas por cualquier inconveniente que pueda causar.

Rafael González-Carrascosa Bassadone
Director de Campo



Kikuyu control on Fairways


In an attempt to control this invasive weed, fairways in the front nine will be sprayed with a herbicide this week.

This herbicide does not only affect kikuyu but will also kill ryegrass, the grass we have used this winter on fairways for overseeding. This has two implications:

·       Herbicide can be spread by the buggies tyres from fairways to roughs, leaving tracks of dead ryegrass on roughs behind. This means the treated area will be closed to buggies for one full day after treatment. Please follow the instructions on the sings. (Wednesday holes 1, 5 and 8; Thursday holes 2, 3 and 6)
·       Even though bermuda is now well established in the fairways, there is a good amount of ryegrass still surviving that will suddenly dye leaving a general brown colour until the bermuda takes its place. Moreover, we know some areas have very little bermuda since it was not planted on time during past refurbishment. These areas will remain bare and will need to be sodded soon.

This is part of our herbicide program that will help to maintain a clean stand of turf. We apologize for any inconvenience it may cause.

Rafael González-Carrascosa Bassadone
Director de Campo
 

miércoles, 26 de junio de 2013

Rafael Gonzalez-Carrascosa en El Mundo

El pasado 12 de Mayo se publicó en El Mundo, edición andalucía, el siguiente artículo recogiendo la opinión del director de campo de RCG Las Brisas sobre distintos aspectos de la industria del golf.

Last 12th of May, the following article appeared in the andalusian edition of El Mundo, where the course director of RCG Las Brisas covered different aspects of the golf industry.

lunes, 24 de junio de 2013

INFORME DE JUNIO - JUNE'S REPORT

ESPAÑOL

Durante esta primavera hemos intentado preparar las distintas zonas del campo para la llegada del verano. Por un lado el suelo, con los distintos pinchados y recebos que mejoren el sistema radicular, y por otro el sistema de riego que garantice una buena distribución del agua. Para ello se realizaron durante la semana de mantenimiento de mayo los pinchados de greenes, tees y antegreenes, y se comenzó el de los roughs. Durante esta semana pudimos también abonar el campo y realizar algunos tratamientos herbicidas generales.
Estamos en estos momentos inmersos en el comienzo de la estación más difícil para Las Brisas, donde hacemos además la transición de los céspedes de invierno (raigrass, poa trivialis) a los de verano (bermuda) en roughs de la segunda vuelta y calles del campo entero. Con la gestión del agua podemos controlar que esta transición no sea demasiado rápida pues de lo contrario encontraríamos muchas zonas marrones por la muerte repentina del raigrass/poa sin que la bermuda haya todavía cogido densidad.

PRIMERA VUELTA:

Greenes: Hemos salido ya de la recuperación del último pinchado y se encuentran en buen estado.
Nuestra intención es mantener unos greenes rápidos que caractericen nuestro campo. Para ello mantendremos unas alturas de siega bajas y utilizaremos pase de rulo semanalmente para conseguir que la bola ruede consistentemente. Para evitar el colchón, y dado que no contamos con una recebadora ligera (las recebadoras pesadas dejan muchas huellas todavía) realizaremos pases de verticut semanales, y seguiremos con nuestro plan de reguladores de crecimiento que produzcan un césped denso y corto.
Con idea de mantener los greenes firmes y con buen sistema radicular, estamos espaciando los riegos cada 3/4 días, por lo que ciertos días se pueden encontrar algo más blando si ha coincidido con el riego profundo. Por último, recalcar que estamos haciendo un seguimiento de la salinidad para actuar si los niveles exceden lo adecuado.

Tees y collares: requieren un riego diario pues los antetees son de raigrass y tienden a secarse.
Por falta de arena no pudimos recebarlo la semana del pinchado por lo que se encuentran algo acolchados; en breve realizaremos algún recebo para corregir este problema.

Calles: la transición se encuentra muy avanzada, aun así hay muchas zonas que no tenemos la certeza que la bermuda haya cubierto completamente, por lo que no podemos forzar todavía la eliminación del raigrass.
Esto tiene trascendencia importante puesto que para el control de kikuyu en las calles de bermuda, los herbicidas con los que contamos también eliminan el raigrass, por lo que si comenzamos a aplicarlo podemos encontrar grandes zonas desnudas. En algún momento debemos considerar comenzar con los tratamientos puesto que la extensión de kikuyu es preocupante. Cuando lo hagamos deberemos estar preparados para la colocación de tepes allí donde no haya suficiente bermuda.
Pronto empezaremos con el pinchado profundo y recebos con una arena adecuada, distinta a la que hemos usado en el rough.

Roughs: hemos resembrado el rough varias veces este otoño e invierno, algunas veces con raigrass, otras con festucas. La última aprovechando el pinchado y recebo. Ya hemos terminado en los nueve hoyos, pero tenemos intención de volver a aplicar una segunda capa de arena una vez terminemos con las calles. En total esperamos aplicar entre 0.5 y 1 cm este año de arena en el rough.
Hasta ahora estamos aguantando bien estas zonas aunque allí donde el riego es deficiente o donde se producen averías rápidamente se producen secas que no se recuperan fácilmente pues requieren que sean resembradas (el raigrass no rebrota una vez se seque, como le pasa a la bermuda). Sin embargo, evitar las secas nos obliga a veces a que otras zonas tengan exceso de agua, y tan solo con un trabajo laborioso de puesta a punto podemos corregir ligeramente estas diferencias.
El control de kikuyu no está siendo muy efectivo pues el uso de especies de invierno hace que en pleno verano no tenga realmente competencia y pueda desarrollarse rápidamente. Este es un factor que no nos ayuda pero aun así continuamos con nuestra estrategia y probamos nuevas combinaciones de herbicidas.

SEGUNDA VUELTA:

Greenes: también fueron pinchados y recebados el mes pasado, y estamos realizando el mismo programa de mantenimiento que los primeros hoyos. Creemos que se encuentran en muy buen estado, aunque la cantidad de poa lógicamente es mucho mayor que en los greenes nuevos. Esto, sumado a que la variedad sembrada no es tan enana, hace que la velocidad sea ligeramente más lenta.
Para el control de poa hemos utilizado un regulador de crecimiento que está evitando la formación de semilla, que es realmente lo que provoca la bola ruede menos franca.
Por otro lado, y dado que estos greenes drenan peor, el control de la salinidad debe ser minucioso para que el lavado de sales se haga en el momento adecuado.
Hemos tratado hace poco para el control de enfermedades dado que esta variedad es más susceptible a Dollar Spot y a Brown Patch.

Calles: la bermuda en estos hoyos está mucho más densa y cada vez queda menos poa trivialis pues esta especie desaparece más fácilmente que el raigrass. Actualmente nuestros esfuerzos irán en controlar el riego para evitar zonas secas y encharcadas, aunque el sistema de riego es más deficiente y no nos permite tanto nivel de control como en los hoyos nuevos. Creemos que podemos pasar un verano muy aceptable.

Rough: quizás sea la peor zona de todo el campo. Es sorprendente la gran cantidad de superficie en la que no contamos con nada de bermuda o incluso kikuyu, y tan solo mantenemos el raigrass que hemos puesto este invierno. Conforme se va muriendo, fruto de un riego deficiente, van apareciendo grandes manchas desnudas. Además la gran cantidad de kikuyu hace bastante irregular su aspecto. En una situación normal aconsejaríamos resembrar con bermuda para tratar de poblar estas zonas; sin embargo este será el último verano antes de la reforma y no tiene sentido actuar.
Para intentar mantener el raigrass el mayor tiempo posible, y dado que el riego es deficiente, con mucha interferencia con los árboles y una mezcla de tipos de aspersores, vamos a tener que crear muchas veces zonas encharcadas. Aun así trataremos de ajustar los tiempos, pinchar las zonas más problemáticas y hacer riego manual con manguera para minimizar los charcos.

MISCELANEOS:

Control de malas hierbas: volvemos a recalcar la dificultad del control de kikuyu. Esto nos debe servir para que tomemos todas las medidas posibles para que en la nueva reforma minimicemos el problema. Estamos diseñando un conjunto de estrategias para asegurar la menor incidencia de kikuyu después de la reforma. Estas actuaciones van a condicionar el comienzo de la obra; los plazos que contemplamos son:

· Las primeras semanas de septiembre: primer tratamiento de los nueve segundos con herbicida de acción total en rough y calles a modificar (no aplicaremos alrededores de greenes y tees donde actuaremos de forma distinta). Los 9 segundos deben cerrarse dos o tres días para no mover el herbicida a los greenes y tees. El herbicida dejará el césped muerto (marrón) a partir de una semana. Seguiremos regando y abonando para provocar el rebrote de la hierba.
· Segundo tratamiento a las 3 semanas que necesitará también el cierre de los nueve segundos durante dos o tres días.
· Dos días después resembraremos toda la zona muerta con raigrass para poder jugar hasta el comienzo de las obras. En dos semanas deberíamos ver la germinación y en un mes debe estar bien establecido.
· Primera semana de marzo comenzaría la reforma. Se cierra para el tratamiento con herbicida.

Control de algas: con los tratamientos herbicidas hemos reducido ligeramente la proliferación de algas.

Drenaje: tan solo hemos identificado un par de drenajes que tenemos que arreglar, junto a los tees del 3. Vamos a colocar una cuneta a lo largo del camino desde el green del 2 hasta el arroyo a mitad de calle. La cuneta prefabricada se encuentra en mantenimiento a falta de instalarla.

Riego: es la gestión que nos lleva más dedicación y a la vez por la que recibimos más quejas. Hemos identificado algún fallo en el programa que generaba excesos de agua en muchas zonas; esto facilitará la puesta a punto el afinado de los tiempos de riego de cada aspersor.
Hemos arreglado el prefiltro del lago que se encontraba roto. Lamentablemente se había hormigonado al fondo por lo que hemos requerido de un equipo de buzos profesionales.
Se ha hecho un primer intento de sellado de la fuga del lago en el green del 12 pero ha sido fallida. Lo intentaremos de nuevo vaciando el lago.
Se ha pedido ya una bomba nueva para sustituir la que se había roto. Coste aproximado 12.000 euros. Hemos vendido los aspersores antiguos por 9.000 euros por lo que la operación nos costará 3.000.
Actualmente tenemos que poner al día el cuadro eléctrico de los pozos pues no funciona correctamente, con un coste estimado de 1.500 euros.



Paisajismo:

· Se han plantado los árboles propuestos en tee y green 4, y en tee 8.
· Tenemos replanteado tres cedros y un acrocarpo en el tee 7.
· Hemos terminado proyecto paisajístico con herbáceas en tee 3 y en el arroyo del 2.
· Hemos arreglado otra parte de los bancales del tee 1.
· Estamos pendientes de recibir algunos árboles sin cargo para reponer algunos que se han muerto de la reforma de los nueve primeros.
· Hemos sellado con pintura los árboles podados en el tee 2.
· Hemos comenzado con la identificación de los árboles de los 9 segundos en preparación para la reforma.

Greens Committee.
Rafael Gonzalez-Carrascosa Bassadone
Director de campo


ENGLISH

During this spring, we have tried to prepare the different areas of the course for the arrival of the summer. First, we have worked out the soil aerifying and topdressing; second, we have checked the irrigation system to guarantee an even precipitation when most needed. Green, tees and aprons aerification were conducted during the maintenance week of May, and roughs were also initiated. During this week we were also able to fertilize the course and to apply some herbicides.
We are currently immersed in the beginning of the most difficult season for Las Brisas, since the winter species (ryegrass and poa trivialis) are transitioning to our warm season species (bermuda). This is particularly true on fairways (18 holes) and roughs (10-18 holes). Managing the irrigation we can control this transition, otherwise this process may be too fast, with the sudden death of the ryegrass/poa when the bermuda is not well covered yet. We have commented in other reports how difficult is to manage irrigation with the system we got and the soils we are dealing with.

FRONT NINE:

Greens: they are in good condition now that they have healed from last aerification.
Our goal is to maintain fast greens all year around, then Las Brisas will be known for this feature. To achieve this, we will maintain a low mowing height and use light rollers on a weekly basis to be sure the ball rolls consistently. Since we do not have a light topdresser (the heavy ones leave tracks on the greens) we will also verticut the greens every week to control thatch; finally we will continue with our plant growth regulator application that produces a dense, short grass.
To produce firm greens with a deep root system, irrigation in this area will take place every 3-4 days; the days when this happens one may find them a bit soft. Finally, we are tracking the salt content in the greens so whenever levels are too high we can react accordingly.

Tees and aprons: they require daily watering because the surrounds are ryegrass and tend to get dry easily.
Now they are a bit thatchy since we were not able to topdress these areas during maintenance week. We have plans to topdress soon to control this problem.

Fairways: transition from cool season to warm season grasses is in process, yet there are many areas where we don't have the certainty that the bermuda has covered completely, so we cannot push the rygrass decay.
This has a major significance in the control of kikuyu on bermuda fairways, since the herbicides we use also kill the ryegrass; so if we start too early applying the herbicide we can find large bare areas. At some point we should consider starting with applications since the amount of kikuyu is high. Then we will have to be prepared to sod those areas were bermuda is lacking.
Aerification and topdressing program will start soon, now that roughs are almost done.

Roughs: they have been reseeded several times this fall and winter, sometimes with ryegrass, others with fescue; last reseeding took place during the aerification and topdressing to achieve a better germination.
We have finished with a first application of sand, but we intend to do it once again after the fairways for a total layer of 0.5-1 cm this year.
So far we are holding well these areas, but where irrigation is poor or whenever there is a problem with a sprinkler, rough gets dry quickly and does not recover well, needing new seeds (ryegrass do not recover once is dry, as it happens with bermuda). However, avoiding dry conditions sometimes means other areas get to much water, and only with a laborious work of fine tuning we can slightly correct these differences.
Kikuyu control is not being very effective as the cool season grasses do not really compete with this weed in mid-summer. This factor does not help but still we continue with our strategy, trying also new combinations of herbicides.

SECOND NINE:

Greens: they were also aerifyed last month, since we are doing the same maintenance program here than in the new greens. We think they are in quite good condition, although the amount of poa is obviously much greater than in the new greens. This, added to the fact that it is a variety that is not as dwarf, makes speed slightly slower.
For poa control we have used a growth regulator that is preventing the seed head formation, which is actually what causes the ball to roll untrue.
Considering that drainage in these old greens are not as efficient, salinity control must be carefully analyzed and followed to wash down salts at the right time.
We have recently applied fungicides to control diseases, because this variety is more susceptible to dollar spot and brown patch.

Fairways: the bermuda in these holes is much denser and present less poa trivialis because this species dye back easier than the ryegrass. Currently our efforts will go to control irrigation to avoid areas too dry or too wet, even though the irrigation system is not as good and do not give us much level of control as in the new holes. We trust fairways will be presented in good shape this summer.

Rough: perhaps the worst area of the entire course. The amount of surface where we do not have bermuda or kikuyu is surprising, and we can only rely on keeping alive the ryegrass from this winter overseeding to present some turf. As ryegrass is dying, as a result of a deficient irrigation, large bare patches appear. In addition, the large amount of kikuyu makes rough appearance quite irregular. In a normal situation I would advise to reseed roughs with bermuda to colonized these areas; however, this will be the last summer before refurbishment and reseeding will be useless.
In other to keep ryegrass alive as long as possible, we will often need to create wet areas. This happens because irrigation system is poor, with frequent interference with trees and a mix of different types of sprinklers. We will still try to adjust sprinkler times, aerify the wet areas and do manual watering with hoses to minimize puddles.

MISCELLANEOUS:

Weed control: once again we emphasize the difficulty of kikuyu control. We should learn from errors and take all possible measures to minimize this problem in the back nine refurbishment. We are designing a strategy to ensure a minimum incidence of kikuyu after the refurbishment. These actions will guide the beginning of the work; the deadlines we are thinking of are:

· First weeks of September: first application with broad spectrum herbicide in roughs and fairways (not apply to green and tees surrounds, where different strategies are programed). These nine holes will be closed for two or three days to avoid herbicide contamination to greens and tees. The herbicide will leave the turf dead (brown) in a week. We will continue watering and fertilizing to promote regrowth of grass. The course will be open meanwhile.
· Second treatment after 3 weeks. Closure of these holes for two or three days is also needed.
· Two days later we will overseed all these dead areas with ryegrass to make them playable until the beginning of refurbishment. In two weeks we should see full germination and in a month it must be well established.
· Refurbishment would begin by the first week of March. Back nine will be definitely close and new herbicide application will take place.

Algae control: Chemical application has slightly reduced the proliferation of algae.

Drainage: we have just identified a couple of old drains that need to be fixed around 3rd tee. A line of gutters will be installed along the cart path from 2nd green to the creek to collect the water in this area. We already got this gutter in maintenance waiting for future installation.

Irrigation: this task is really taking most of our attention and time, still it generates many complaints. We have recently identified a problem in the program that generated excess water in many areas; from now on it will be easier to adjust and reduce sprinkler times in many situations that have been a problem in the past.
We have repaired the prefilter in the irrigation lake that was broken. Unfortunately it was fixed to the foundation with concrete so this job required a team of professional divers.
A first attempt has been made to seal the leak of the irrigation lake at 12th but it has been failed. We will try it again emptying the lake.
We have already ordered a new pump to replace the broken one. Cost is approx. 12,000 euros, but since we have sold the old sprinklers for 9,000 euros, final cost will be 3,000 euros.
Last problem is that we have to fix the electric panel the controls the pumps of the wells, with an estimated cost of 1,500 euros.



Landscaping:

· Proposed 8th tee, 4th green and tee trees have been planted.
· Three cedar trees and one acrocarpus tree on the 7th tee have been allocated and will be planted soon.
· Two landscape projects with herbaceous plants on 3rd tee and 2nd creek have been finished.
· Another parterre on the 1st tee has been redesigned.
· We are waiting to receive some trees free of charge to replace some that have died from the refurbishment of the front nine.
· Cuts from pruning in the trees at 2nd tee have been sealed with paint.
· We have started with the identification of the trees in the back nine in preparation for the refurbishment.

Greens Committee.
Rafael Gonzalez-Carrascosa Bassadone
Course Manager

sábado, 4 de mayo de 2013

INFORME DEL CAMPO - GREENS REPORT MAYO 2013

INFORME DE CAMPO: MAYO 2013

Ahora que el invierno llega a su fin y las temperaturas comienzan a ascender, es hora de intentar mejorar la densidad de nuestro césped en los nueve primeros hoyos, en particular en la zona de rough (donde es realmente necesario) y en los greenes. Al mismo tiempo, necesitamos preparar el campo para que soporte las posibles condiciones extremas veraniegas. Esto significa que hay que trabajar para conseguir un sistema radicular profundo y denso, lo que se consigue mediante la aireación y el aporte de enmiendas de suelo. El mes pasado pinchamos y recebamos greenes, entradas y tees. Estas prácticas serán llevadas a cabo de nuevo en Mayo, así como el pinchado de calles y roughs de los nueve primeros hoyos.
Los trabajos de riego y drenajes progresan adecuadamente.

PRIMERA VUELTA

Greenes: han ganado mucha densidad en lo que llevamos de primavera. El uso de reguladores de crecimiento nos está ayudando a reducir el crecimiento de la planta y al control de la poa annua. Estamos todavía en los primeros estadios del programa con fitoreguladores pero los resultado positivos son ya evidentes. La población de poa annua es baja y comenzaremos en breve con un programa de cogida a mano en cuanto las cabezas florales sean fácilmente identificables. Al mismo tiempo retomaremos la eliminación de kikuyu en los greenes, por si hubiera alguna contaminación.
El green del hoyo nueve fue tepeado el pasado invierno, antes de la apertura, con material del viejo vivero, porque con contábamos con un vivero de la nueva variedad y con la misma arena. Este parche está presentando mucha Poa annua y enfermedades típicas de la antigua variedad de césped., por lo que, en cuanto tengamos un vivero nuevo, este parche debería ser levantado y retepeado correctamente.
Durante este tiempo se han usado diferentes enmiendas dentro de un programa continuado, que incluye los siguientes productos entre otros: yeso y enmiendas cálcicas para controlar el sodio en el suelo, extractos de algas para promover el crecimiento radicular, zeolitas para incrementar la capacidad de retención de nutrientes en las arenas, partículas cerámicas para aumentar la capacidad de retención de agua, humatos para incrementar el contenido en materia orgánica de la arena…
En un par de semanas daremos un segundo pinchado a los greenes con pinchos huecos. Esperamos que esta vez el daño de vehículos pesados en los greenes, dejando huellas marcadas, sea menor que en el último pinchado. La aplicación de arenas de recebo nos ayudará a evitar la formación de colchón o fieltro.

Tees y collares: durante la construcción no se añadió turba o ninguna otra enmienda a la arena de estas zonas; esto hace que sea más complejo el mantenimiento de los tees y collares, en particular en cuanto al manejo del agua. Estas zonas son difíciles de mantener húmedas por lo que requieren del apoyo de riego a mano frecuentemente. Es por lo tanto necesario pinchar y enmendar consecuentemente para aliviar estos problemas. Seguiremos trabajando en este frente.

Calles: este invierno, debido a la mezcla de raigrass y poa, las calles presentaban un aspecto parcheado heterogéneo, pero estas especies de invierno desaparecerán progresivamente. La altura de siega en calles se ha bajado hasta 10 mm para ayudar en este proceso y promover la vuelta de la bermuda. Parece que la bermuda está retomando y cubriendo adecuadamente, pero si encontramos zonas extensas que no se hayan cubierto bien, éstas serán tepeadas.
Pronto empezaremos con el pinchado profundo y recebos. Esperamos poder extender entre 0.5 y 1 cm de arena, aunque tendremos que lidiar con la dificultad para encontrar una zona de acopio para la arena. Estamos todavía buscando en material para el recebo que sea idóneo y a un precio razonable.
Más adelante tenemos previsto probar algunos herbicidas para el control de kikuyu sobre bermuda. Es probable que no consigamos una erradicación completa pero al menos favoreceremos la competencia de la bermuda.

Roughs: hemos resembrado el rough varias veces este otoño e invierno, algunas veces con raigrass, otras con festucas. Con esta última intentamos promover una especie que aporta crecimiento lateral. Sin embargo, en mi opinión, no estás siendo suficiente y necesitaremos aportar nuevas cantidades de semilla en un programa continuo. Ha quedado demostrado que es difícil germinar semillas en este tipo de suelos tan arcillosos y duros.
Mientras tanto tendremos que esperar y ver cómo se comporta el rough en verano una vez que soporten las peores condiciones. Será un ensayo muy bueno para ver si seguimos usando estas especies en la reforma de los nueve segundos o si volvemos al uso tradicional de roughs de bermuda.
Esta es el área del campo donde el recebo con arena es más crítico e importante y procederemos consecuentemente. Añadiendo una capa de arena conseguiremos un establecimiento más adecuado de cualquier resiembra y será más fácil mantener el campo húmedo pero no encharcado. Puede ser una buena idea plantear un programa fuerte de recebos para el próximo año considerando que los nueve segundos estarán cerrados y será más fácil de acopiar arenas en un punto cercano. El transporte de la arena desde la zona de mantenimiento hasta los hoyos más altos es realmente tedioso.

SEGUNDA VUELTA:

Greenes: considerando que los greenes serán levantados y reformados pronto, nuestro objetivo es mantenerlos en buena forma y estado durante el verano, pero no comenzar ningún programa a largo plazo. Por ejemplo, el control de Poa annua o de la entrada de bermuda desde el antegreen no tienen sentido puesto que los resultados no se apreciarían hasta pasado un largo plazo. De todas formas, el pinchado y recebo se llevarán a cabo para conseguir unas condiciones favorables este verano.

Calles y roughs: el reverdeo de primavera se espera pronto, seguramente antes en las calles puesto que la poa trivialis tiene una transición a bermuda más fácil. Nuestro objetivo es hacerlo lentamente, pero si tenemos un periodo seco y caluroso, puede ocurra repentinamente. En este caso podemos encontrar un aspecto general pardo y seco hasta que la bermuda retome su espacio y sustituya a nuestro césped de invierno.
No creemos que debamos invertir esfuerzos en un programa de aireación o recebo en esta zona.

MISCELANEOS:

Control de malas hierbas: la primera aplicación de pre-emergentes ya se ha realizado, y una segunda aplicación está programada para la segunda semana de Mayo, con parte del campo cerrado por mantenimiento. Con este herbicida controlamos las malas hierbas de verano (pata de gallina y eleusine, dos especies muy comunes en céspedes). El rough de los nueve primeros no se trató puesto que tenemos programadas resiembras continuas.
El control de kikuyu continua en los roughs (son necesarias aplicaciones sucesivas) y, como hemos mencionado anteriormente, tendremos que tener especial cuidado para mantener las calles de bermuda limpias.

Control de algas: estamos viendo una explosión en la población de algas y otras hierbas acuáticas. Son difíciles de controlar, y este es uno de los motivos por los que se ha propuesto la construcción de un lago de riego independiente. Estas algas perjudiciales no solo desmerecen el aspecto del lago sino que pueden atascar los aspersores si alcanzan el sistema de riego. El control químico es difícil puesto que el curso del arroyo diluye continuamente cualquier aplicación. Además, el uso de productos tóxicos está prohibido en un arroyo público. Aun así, vamos a probar algún producto registrado para el control de algas.

Riego y drenaje: seguimos trabajando en ambos aspectos sin cesar. Sin embargo, los trabajos de drenaje deben ser pospuestos hasta el siguiente invierno (después de reparar el último drenaje antiguo roto junto al green del 8) ya que debemos concentrarnos ahora en el riego. Debemos instalar nuevos aspersores y el tiempo apremia. Los satélites de riego de la segunda vuelta ya han sido instalados y necesitan programarse en el sistema (en la base de datos del programa de gestión de riego).

Paisajismo: se han colocado unas estacas en los hoyos 4 y 8 marcando la propuesta de localización de varios árboles pendientes de adquirir. Además, se ha propuesto la revegetación del lateral derecho del hoyo 2, incluyendo adelfas (Nerium oleander) para la linde y juníperos (Junipero chinensis) para el bancal.








GOLF COURSE REPORT: MAY 2013

Now that winter is over and temperatures have started to improve, it is time to increase grass density in the front nine, especially in the rough (where it is really needed) and on the greens. At the same time, we need to prepare the course to handle a possible hard summer. This means working to produce large and dense roots, which will be achieved with aeration and soil amendments. Last month, we aerified and top-dressed the greens, aprons and tees, and this will be repeated in May, along with the fairways and rough cultivation and topdressing to the front nine. Irrigation and drainage revision also progress adequately.

FRONT NINE

Greens: have gained good density. The use of a growth regulator is helping to reduce shoot growth and controlling poa annua. We still are in the first stages of this program, but positive results are already evident. Poa annua population is low and hand picking will be reinforced soon as seed heads become easily identified. At the same time, 'scouting' for kikuyu on greens will resume.
The ninth green was sodded last winter with material from the old nursery, because turf with the new variety (A4) and new sand type were unavailable. This patch is showing a lot of poa and diseases typical of the old grass, and, as soon as we have a new nursery, it should be stripped off and replaced.
Different amendments have been used in a regular program for different reasons: foliar fertilizers to balance nutrients; wetting agents to prevent dry patches; gypsum and calcium amendments to control sodic soils; algae extract to promote root growth; zeolites to increase nutrient holding capacity of the sand; ceramic particles to increase water holding capacity; humates to increase organic matter...
In a couple of weeks, a second hollow thinning will be done. We will try to prevent heavy equipment going on the greens to stop wheel tracks. A topdressing application will help to prevent thatch formation.

Tees and aprons: No peat or any other amendment were added during the construction to these areas; this now makes the tees and aprons more difficult to maintain, particularly when talking about water management. They are really difficult to keep wet and hand watering is frequently needed. Aeration and soil amendments are needed to alleviate this problem. We will keep working on this front.

Fairways: ryegrass and poa annua mix brought a somewhat patchy appearance this winter, but winter grasses will die back shortly. Mowing height has been lowered down to 10mm to help this process and to promote Bermuda grass growth. It seems that Bermuda grass is coming back adequately, but if we find any extensive areas not covering as we have to expect, sod will be used.
Aeration with a deep line and topdressing will start soon. Topdressing with a 0.5-1 cm layer is desirable, but we have to struggle with the difficulty of finding an area to store and pile all the sand. We are also still looking for the right material with a reasonable price.
Later on, a herbicide to control kikuyu on Bermuda grass will be tried. It is more likely that a complete eradication cannot be achieved, but, at least, it will help Bermuda grass to outcompete the Kikuyu.

Roughs: we have overseeded the roughs several times this autumn and winter, some with ryegrass, some with festuca rubra. With the later, we are trying to provide a species with lateral growth. However, in my opinion, this is still not enough, and we will have to maintain a continuous program. It is difficult to germinate seed in a hard bare soil.
In the meantime, we have to wait and see how roughs perform this summer once we experience the worst conditions: high temperature; saline and sodic irrigation water; and hard soils. It will be a real test to decide whether we use the same species on the back nine or if we go back to a Bermuda grass rough.
This is the area where topdressing is more important and so we will proceed. Adding sand will make it easier to establish new seed and to keep the soil wet but not soaked. It might be wise to program heavy topdressing next year, considering the back nine will be closed and stockpiling sand close to the front nine will be easier. Transportation of sand from the maintenance area to the upper holes is tedious.

BACK NINE

Greens: considering the greens will be refurbished soon, our goal is to keep them in good shape for this summer but not commence a long-term program. For instance, poa annua or Bermuda encroachment control is unhelpful, because it will take too long before favorable results. Still, aeration and topdressing will be carried out.

Fairways and rough: spring back is expected soon, probably sooner on fairways since the poa trivialis transition is easier. Our goal is to make it slowly, but after a dry hot period, it could happen suddenly. In this case, a brownish appearance is normal until the Bermuda grass comes back and replaces the winter species.
We do not think we should invest time in either aeration or a topdressing program.

MISCELLANEOUS

Weed control: the first pre-emergence application was already done and a second one is planned for the second week of May, once we have closed the course for maintenance. With this herbicide, annual summer weeds will be controlled (goosegrass and crabgrass, two common weeds in turf). Roughs on the front nine were not treated since overseeding was programmed.
Kikuyu control will continue in the roughs (several applications are needed) and, as mentioned before, special care will be taken in the fairways to keep Bermuda grass clean.

Algae control: An alga and other aquatic weeds boom has occurred. It is quite difficult to control and this is one of the reasons why an independent irrigation lake is proposed. These noxious algae not only ruin the view of the lakes, but also can plug the sprinklers if they reach the irrigation system. Chemical control is difficult since a continuous flow dilutes any application. Moreover, use of toxic products in a public creek is illegal. Even so, a couple of products labeled for algae control will be tested.

Irrigation and drainage: we keep working on both projects with a steady pace. However, drainage work will be soon be postponed until next year (after repairing the broken drainage near to green 8) since we should focus now on irrigation. New sprinklers have been installed and some are still to be done. New irrigation satellites have also been installed in the back nine and need to be programmed in the system.

Landscaping: stakes on holes 4 and 8 are the proposed location for several trees that will be purchased. A proposal for the right hand side banks on hole 2, include Adelfas (Nerium oleander) for the edges and Junipers (Junipero chinensis).

Comité de greenes – Greens Committee
Rafael González-Carrascosa (Director de Golf).

Mayo 2013 – May 2013

miércoles, 17 de abril de 2013

Bolsas de Arena/Sand Bags


 
Tras las preguntas por parte de algunos Socios sobre la importancia del uso las bolsas de arena, paso a aclarar este punto:

La reposición de arena en las chuletas tienen como objetivo nivelar el terreno y ofrecer un lecho para la recuperación del césped lo antes posible. Cuando la especie no tiene crecimiento lateral a través de rizomas o estolones, dicha arena debe llevar semilla para repoblar la chuleta, en especial cuando la altura de siega del césped es baja; en los otros casos el propio césped colindante cubrirá el daño.
En nuestro caso tenemos dos situaciones distintas. Por un lado las calles con bermuda y con un tipo de arena mas basta, por otro los tees con agrostis y arena de más calidad.
La arena entregada a los socios para que ayuden a la reparación de las chuletas no contiene semilla alguna, pues mezclarla con semilla podría significar que por error se extendiese en alguna zona distinta de la deseada: una semilla de césped en el sitio erróneo no deja de ser una mala hierba.!!! Por ello, los tees, que requieren un tipo de arena distinta y la mezcla con semilla de agrostis, serán arreglados por la plantilla de mantenimiento que sabrá actuar correctamente.
Por todo ello:
  • Utilice la arena proporcionada por el club sin semilla para arreglar las chuletas en calles y roughs.
  • Deje las chuletas de tees que serán mantenidas por el personal de mantenimiento.
Gracias por su colaboración.
-------------------------------------------
I have been asked by some Members to explain why the use of the sand bags is essential.
The primary objectives to filling the divots with sand are: levelling the surface; and providing a proper medium for turf recovery. Whenever the turf species has no creeping growth potential, either with stolons or rhizomes, sand should be mixed with seeds for adequate turf cover, particularly where mowing heights are low; in other cases, the adjacent turf will cover the gap.
We now face two different scenarios: bermuda fairways with coarse sand; and, tees with bent grass with finer sand.
Members helping to repair divots will be given sand with no seeds, because sand with seeds may by error be extended to undesired zones; a turf seed in an inappropriate place will always be a weed.!!! Therefore, the tees that require a different type of sand and a mixture of bent grass seed will be managed by the maintenance team.
Consequently, please:
  • Use the sand without seed provided by the club to repair divots on the fairways.
  • Leave the divots on tees to be done by the maintenance team.
We very much appreciate your understanding, and thank you for your help.
 
 
Rafael Gonzalez-Carrascosa Bassadone
Director de Campo