sábado, 12 de octubre de 2013

APERTURA - OPENING

Estimados socios:

Apertura del campo


Como ya informamos en su día el próximo lunes 14 de Octubre reabriremos los 18 hoyos, aprovechamos para informarles de lo siguiente;


Resiembra y buggies por los caminos



Después de analizar las opciones y particularidades de este año, se ha decidido resembrar con Festuca Arundinacea los roughs, y Poa Trivialis las calles.


La germinación y establecimiento de cualquier césped requiere para su correcta evolución limitar el tráfico y mantener la superficie húmeda permanentemente. Limitando el tráfico evitamos por un lado el pisoteo de la joven planta y por otro que el barro se levante al encontrarse el suelo saturado de agua. Por ello es necesario que al menos durante un mes (dependiendo de lo que acompañe el tiempo) los buggies circulen exclusivamente por los caminos*.

* Solo estarán autorizados a circular por los caminos de los primeros nueve hoyos los buggies propiedad del club, estos buggies están equipados con un sistema de gestión de flota el cual nos permite controlar y limitar el acceso de los mismos.
El uso de buggies en los primeros nueve se considera una concesión para aquellos socios que necesiten ayuda y no puedan jugar sin un buggie.
Este sistema de gestión de flotas nos permite obtener a tiempo real un registro completo del uso de cada buggie, si se observase la negligencia de cualquiera de los socios nos veríamos obligados a tomar acciones disciplinarias.

Reglas locales

Durante las próximas semanas, el rough de los primeros nueve hoyos será considerado "Terreno en reparación".Para facilitar el cumplimiento de esta regla local temporal, encontraran en los hoyos 4 y 7 (pares 3) un área de dropajeobligatorio.

Agradezco desde aquí su ayuda y comprensión. Con ello conseguiremos un mejor campo para el disfrute de todos.

Un cordial saludo.

Paul Muñoz Langley
Director General

--------------------

Dear Members,


Course opening



We have kept everyone updated by email and website reports,now that the reopening of the 18 holes is near, next October 14th, please read and follow carefully the following advices;



Overseeding and buggies on the path



After considering the options and limiting factors, it was decided that fairways would be overseeded with Poa Trivialis, and roughs with Tall Fescue.


Germination and establishment of any grass requires restricted traffic and well-moistened soil until root the system develops. Traffic restriction prevents direct damage to the young seedlings and avoids foot traffic in waterlogged soil. Therefore it is necessary that buggies be kept on the cart paths for at least a month (depending on the weather)*.

*On the front nine holes, only club buggies will be permitted, these buggies are equipped with a control fleet system that enables us to limit the access on to any vulnerable surface.
NB.
The use of buggies at this time is to help those members who cannot play without the use of a buggie.
The GPS system allows detailed accurate information regarding the movement of buggies on the course, such you chose a buggie please note that a log from each buggie will be monitored. Should any Member(s) chose not to observe the understandable request to keep on paths at all times disciplinary action will take place.

Local Rules

During the next weeks, the rough of the front nine holes will be considered "Ground under repair". To ensure easy, quick and understandable play, you will find obligatory drop zones in holes 4 and 7 (par 3's).

I truly appreciate your patience and help. With proper care we will achieve a healthy, enjoyable turf for the future.

Kind regards.

Paul Muñoz Langley
General Manager

sábado, 5 de octubre de 2013

INFORME DE OCTUBRE - OCTOBER REPORT



Informe del Comité de Campo - Octubre 2013

Estimados socios:

Comprendemos la frustración de algunos socios y nos disculpamos por el cierre de los nueve primeros hoyos durante las últimas semanas. Desafortunadamente no nos quedaba otra opción. Entre tanto esperamos deseosos la apertura de los 18 hoyos  a mediados de octubre.

MOTIVOS:

En resumen, los problemas surgidos en el rough y en algunas calles han sido causados por la deficiente esterilización realizada antes de la reforma de los nueve primeros hoyos y la tardía finalización de los trabajos por parte del contratista, que provocó no llegar a tiempo a sembrar Bermuda en su mejor periodo de crecimiento.

A finales de Agosto, nuevamente nos asesoramos, a través de nuestros ingenieros agrónomos y de manos de la futura dirección de obra, de cómo atajar estos problemas y de cómo evitarlos en el futuro. Os recomendamos que lean el informe adjunto.

En el rough ahora se ha procedido a la eliminación de todas las malas hierbas y se ha sembrado Festuca Arundinacea. Nuestros ingenieros agrónomos nos han aconsejado esta variedad cespitosa como mejor opción disponible por adaptarse mejor a nuestro clima, condiciones de agua y suelos arcillosos.

INFORME:

Todas las recomendaciones han sido puestas en práctica y esperamos reabrir los 18 hoyos aproximadamente a mediados de octubre. Nuestro Director de Campo nos ha aconsejado considerar todo el rough como “terreno en reparación” durante las cuatro primeras semanas, esto permitirá generar mayor densidad y dar una mejor cobertura a nuestros roughs.

La fecha de comienzo de la reforma de los nueve segundos ha cambiado a septiembre de 2014, en línea con las recomendaciones del informe recibido. Durante la reforma de los nueve segundos hoyos y dados los trabajos que se están realizando actualmente, los nueve primeros hoyos podrán soportar el trafico de jugadores y las altas temperaturas.

De nuevo, queremos pedir disculpas a todos los socios por las molestias ocasionadas y agradecerles la paciencia y comprensión que están mostrando.

Comité de Campo.

Informe detallado de Acttua (Servicios integrales de ingeniería).







Report from the Greens Committee – October 2013

Dear Members,

We do appreciate the frustration that you are experiencing, and regret the closure of the front nine holes for the past few weeks. Unfortunately, we had no other choice. We now look forward to having a full 18-holes to play from mid-October.

REASON:

In brief, the problems we faced with the rough and some fairways were caused by the unsuccessful - but recommended - sterilization of bad grasses prior to commencement of the front nine refurbishment, as well as the late completion of works by the contractor which resulted in missing the full growing season for the Bermuda grass.

At the end of August, we again asked our agronomist advisors and project managers for further advice on how to deal with these problems and how to avoid them in the future. We urge you to read the attached Report for further details.

The rough has now been cleared of all bad grasses and seeded with Tall Fescue.  We have been advised by our agronomist advisors that this is the best cool season species available and more tolerant to our climate, water and soil conditions.

REPORT:

All recommendations have now been implemented, and we look forward to opening the full eighteen holes from mid-October. Our Course Manager has advised that, during the first 4 weeks, all rough on the front nine holes should be considered “Ground Under Repair”, which will allow the new grass to fill out and give a good ground cover.

The commencement of the back nine refurbishment has now been changed to September 2014 in line with the advisors’ recommendations. Whilst the back nine refurbishment is underway, the front nine, with the works being carried out at present, will withstand Member traffic and will be more able to cope with our climate.

Once again, we apologize for any inconvenience and thank you very much for your patience.

Greens Committee

Full report from Acttua, Engineering services.


 

miércoles, 25 de septiembre de 2013

PRIMEROS NUEVE HOYOS - FRONT NINE HOLES


NOTA IMPORTANTE 
Estimados socios,

Después de evaluar el crecimiento de la reciente resiembra, el Comité de Campo y la Dirección entienden que las condiciones del campo no nos permitirán reabrir los primeros 9 hoyos, al menos hasta el 14 de Octubre. No obstante, se revisarán las condiciones a diario por si nos permitieran abrir en una fecha anterior a la mencionada.

Debemos asegurar que la capa de césped ha madurado lo suficiente, y que, no existen áreas donde nuestros socios puedan resbalar y caer.

Rogamos disculpen las molestias y entiendan las medidas propuestas, ya que son por el bien de vuestro campo.


IMPORTANT NOTICE
Dear Members,
After assessment of the germination progress and the speed of growth of the new seed, the Greens Committee and Management do not anticipate the front nine holes being re-opened until October 14th. However, conditions will be assessed on a daily basis.  

We must ensure that the grass has sufficient maturity, and there are no dangerous areas where Members could slip.

We do apologise for this inconvenience, but trust you will understand that all these measures are being taken for the benefit of your golf course.

jueves, 12 de septiembre de 2013

INFORME DEL COMITÉ DE CAMPO - STATEMENT FROM THE GREENS COMMITTEE


Informe del comité de campo, septiembre - 2013

Estimados socios,

A raíz de la reciente información sobre el posible cambio de fecha para el inicio de la reforma de los segundos 9 hoyos, nos gustaría informarles de las acciones llevadas a cabo en calles y roughs de los primeros 9 hoyos. Por otro lado también nos gustaría darles una pequeña explicación de las circunstancias por las que el rough ha sufrido tanto a finales de julio y durante el mes de agosto de este año.

Debido a la época del año en que finalizó la reforma de los primeros 9 hoyos, no tuvimos la oportunidad de sembrar las zonas de rough y calles con bermuda (noviembre es la peor época del año); en aquel momento se decidió sembrar con raigrás, semilla de invierno. Desafortunadamente, ahora todos sabemos que este tipo de especie cespitosa no es factible con nuestra agua de riego, condiciones del terreno y la temperatura de finales de julio y agosto.

Desde hace muchos años las zonas de rough de todo el campo han sido una mezcla de kikuyu y algo de bermuda; por el bien del campo, los primeros 9 hoyos han sido tratados con un herbicida con el propósito de controlar ese tipo de malas hierbas.

Después de varias consultas con otros Greenkeepers con similares problemas de agua, se nos ha recomendado una hierba del tipo "cool season" llamada Festuca Arundinacea. Rafael González-Carrascosa, Director de Campo, ha verificado dicha especie de manera satisfactoria en nuestro vivero durante los meses de julio y agosto.

El programa de trabajo es:

·       Roughs:
Desde mediados de septiembre, las zonas de rough serán resembradas con festuca.

·       Calles:
Los principales problemas están en los hoyos 2 y 3. Dichas zonas están siendo reparadas actualmente con tepes de bermuda aprovechando que las temperaturas aún son favorables al crecimiento de ésta. La resiembra se llevará a cabo a primeros de octubre para asegurarnos que el campo está en buenas condiciones durante el otoño y el invierno.

Les adelantamos que se llevaran a cabo futuros trabajos tal y como requieren nuestras calles, particularmente en los hoyos 2 y 3. En junio del próximo año, cuando se inicie la transición de hierbas de invierno con las de verano, realizaremos un recebado para asegurarnos de una buena superficie tanto visual como de juego durante todo el año.

Entendemos que la fecha recomendada para inicio de la reforma de los segundos 9 hoyos es una decisión acertada. Nos permitirá erradicar el kikuyu y las malas hierbas y realizar un recebado de toda la segunda vuelta, lo que dará la oportunidad de conseguir un crecimiento adecuado de la nueva bermuda desde la primavera. La calidad de la bermuda será excelente y además dicha decisión será financieramente beneficiosa.

Todo lo anteriormente mencionado ha sido contrastado y avalado por la empresa independiente SURTEC – ACTTUA, que ha llevado a cabo numerosos proyectos, entre otros, la gestión del proyecto de “La Moraleja 3” y “La Moraleja 4”. Por otro lado, también estamos esperando recibir un informe de la RFEG, elaborado por el Head Greenkeeper, David Gómez Agüera. Dichos informes estarán a su disposición en la oficina de Dirección del club.

Finalmente, nos gustaría pedir disculpas a los socios  que han sufrido durante el mes de agosto  los problemas arriba comentados, y a todos los socios por las molestias ocasionadas durante la ejecución de los trabajos que se están llevando a cabo en estos momentos.
Comité de campo.



September, 2013: Statement from the Greens Committee

Dear Members,
Following the recent announcement of the possible change in the commencement date for the back nine refurbishment, we would like to advise you on the action planned for the front nine roughs and fairways. We would also like to briefly explain why the rough suffered so much in late July and August this year.
Due to the timing of the completion of the front nine refurbishment, we were unable to sprig the fairway or rough areas with Bermuda (November is the wrong time of year); the advice given at the time was to seed with a cool season grass (Rye).  Disappointingly, it is now obvious to us all that this particular species could not cope with our water and soil conditions and the high temperatures in late July and August.
For many years now the rough areas on both nines have been a mixture of weed Kikuyu and very little Bermuda; in the best interests of the course, the front nine is being treated with an herbicide in an attempt to control these bad grasses.
After speaking with other course managers with similar water conditions we have been advised that the most successful cool season grass to use is Tall Fescue. Rafael, our Course Manager, has successfully trialed this through late July and August in our nursery and this species has done well.
The Schedule of Works is:
·      Rough: 
From mid-September, the rough areas will be reseeded with Tall Fescue grass. 
·      Fairways:
The main problems are on holes 2 and 3.  These areas are currently being repaired primarily with turf while we still have relatively high temperatures to enable the Bermuda grass to bed in.  Over seeding will take place at the beginning of October to ensure that the course is in good condition   throughout the autumn and winter. 
It is anticipated that further works will be carried out as required on our fairways, particularly the second and third holes, next June when the over seeding is terminated; heavy top dressing and feeding will ensure a good surface - both visually and playability throughout all year round.
We believe the recommended change to commence the back nine renovation in September, 2014 is the sensible decision. It will allow us to kill the Kikuyu / bad grasses and Sand Cap the complete back nine holes, growing in the new Bermuda from Sprigs; the quality of the Bermuda will be excellent and this approach will be financially beneficial.
We also continue to take external advice from SURTEC - ACTTUA (as indicated in the AGM Proposal for the back nine renovations) - a company which has undertaken several projects, including the project management for the construction of “La Moraleja 3” and “La Moraleja 4”, both Jack Nicklaus courses, one of them a signature course. In addition, David Gómez Agüera, Head Greenkeeper for the Royal Spanish Federation, has agreed to provide a future report. Reports will be available at the managers office for your review.
Finally, we would like to apologies to those Members who used the course in August for the above grassing problems, and to all Members for any disruptions until the work is completed.
Greens Committee.

viernes, 6 de septiembre de 2013

FUTURA REFORMA - FUTURE REFURBISHMENT


Últimas noticias: Reforma

Estimados Socios,

Como saben, el campo ha sufrido recientemente pobres condiciones, tanto en el rough como en algunas calles.

Actualmente estamos tomando medidas para solucionar dichos problemas, y así los socios puedan disfrutar de los primeros 9 hoyos en buenas condiciones durante los próximos años de forma regular.

Queremos mantenerles informados sobre nuestros planes de la reforma de los Segundos 9 hoyos.

Habiendo tenido los actuales problemas de crecimiento de hierbas en los primeros nueve hoyos, estamos sopesando la posibilidad de retrasar el comienzo de la reforma de los segundos nueve hoyos al mes de septiembre de 2014. Esto nos asegurará un mayor periodo de crecimiento de la bermuda.

La erradicación de malas hierbas se llevará a cabo y se completará con anterioridad al movimiento de tierras y sin tener la necesidad de tepear las calles, dándonos la oportunidad de aportar una gran capa de arena para resembrar con esquejes de bermuda. Dicho proceso ahorrara al club varios cientos de miles de euros y nos aseguraríamos de la obtención de unas calles de bermuda excelentes.

*Se espera que los segundos 9 hoyos estén abiertos para el 1 de agosto de 2015.

Si esta decisión se llevará a cabo, obviamente significaría que los 18 hoyos permanecerían abiertos durante el próximo invierno y verano.

Queremos acentuar que los problemas con los que estamos conviviendo en la actualidad en las calles no tienen nada que ver con la ejecución de la obra, la cual creemos que se ha ejecutado correctamente; todos sus componentes como; Tees, Bunkers, Greens, Riego y drenajes se han instalado correctamente.

Continuaremos manteniendoles informados de nuestros progresos.

Junta Directiva,
Real Club de Golf Las Brisas

Update: Course Refurbishment

Dear Members,

As you may be aware the Course is currently experiencing poor grass conditions - both rough and some fairways.

We are currently taken action to rectify these problems to enable the members to enjoy the front nine holes in good condition through the coming winter and summer 2014.

We want to keep you informed of our plans for the refurbishment of the back nine holes.

Given the current fairway grassing problems on the front nine holes, we are examining the possibility of delaying the start of the refurbishment of the back nine holes until September, 2014; this will ensure we maximise the utilisation of the best growing periods for our Bermuda Grass. The killing of ‘bad’ grasses will be carried out and completed before earth moving, and it is expected turf laying will not be required thus giving us the opportunity to sand cap and sprig with Bermuda grass. This process will save the club several hundred thousand euros and ensure excellent Bermuda fairways.
 
 
*The back nine holes are expected to be re-opened by August, 2015. 

If this timing decision is made, it will obviously mean all 18 holes will be open throughout the coming winter and next summer.

We also want to stress that, notwithstanding the short-term fairway grassing problems that are being addressed currently, we believe the refurbishment of the front nine holes was well-executed; all the features have been installed correctly: Tees; Bunkers; Greens; Irrigation; and Drainage.

We will continue to keep you informed of progress.

Executive Committee,
Real Club de Golf Las Brisas

jueves, 29 de agosto de 2013

TRABAJOS NECESARIOS EN EL CAMPO - NECESSARY COURSE MAINTENANCE


Ultimas Noticias: Mantenimiento de Campo


Estimados socios:

Nos gustaría informarles de nuestros planes con respecto a los  trabajos de mantenimiento que vamos a realizar en el  campo de golf de Las Brisas.

Al igual que nosotros, los socios que han estado en el club durante este verano, estarán desilusionados con el estado de la resiembra de raigrás en el rough, y con la débil recuperación de bermuda, después de la reforma ejecutada, sobre todo en las calles del 2, 3 y 8.

No existe ninguna razón para creer que este año se hayan producido circunstancias excepcionales adversas, y, mientras esperamos que las condiciones del campo mejoren en las siguientes semanas, a raíz de la resiembra que se va a efectuar durante el mes de septiembre, reconocemos que debemos tomar medidas para asegurarnos de una calidad sostenible durante todo el año.

Con respecto a las calles de los primeros 9 hoyos, la solución propuesta es reparar y tepear con Bermuda las calles de los hoyos 1, 2, 3 y 8 durante el mes de septiembre.

Por otro lado, respecto a las zonas de rough de los primeros nueve hoyos, hemos planeado la erradicación de todo reducto de raigrás y malas hierbas (kikuyu, grama) en dos etapas, para dar oportunidad a que la nueva semilla germine sin competencia de manera uniforme, y lo que es mas importante, libre de malas hierbas. El plan es comenzar la resiembra a mediados de septiembre con  “Festuca Arundinacea” especie ya probada, mucho mas tolerante a nuestro clima, calidad del subsuelo y a la eleva salinidad de nuestra agua de riego. Esta especie ha obtenido resultados muy satisfactorios en campos como RCG El Prat, PGA de Cataluña, RC de Pineda y en Santana Golf. Esperamos que la germinación se produzca dos semanas después de su siembra y los primeros cortes de rough se realizarán a las dos semanas de su germinación.

Es importante recalcar lo siguiente:

·  Durante los primeros días observaremos como los roughs mueren completamente para permitir la germinación de la nueva semilla.
·  Hasta la germinación es necesario que el suelo permanezca las 24 horas húmedo, por lo que daremos riegos frecuentes. Encontrarán el campo saturado de agua en algunas zonas produciendose charcos.
·  Los buggies se mantendrán por los caminos hasta que estas zonas estén en condiciones. Dicho proceso necesitará varias semanas.

Para que estas tres operaciones (tepeado de calles, aplicación de herbicida y sembrado) se lleven a cabo, necesitamos cerrar los primeros nueve hoyos. El siguiente gráfico muestra el periodo en el que sólo dispondremos de 9 hoyos abiertos.

*Los días marcados en rojo, son aquellos en la que solo dispondremos de 9 hoyos abiertos.

Además de estos trabajos de mantenimiento extras, resembraremos los roughs con la misma “Festuca Arundinacea” los segundos nueve hoyos, y todas las calles con “Poa Trivialis” a partir de primeros de octubre. Esto dará otras dos semanas extras para que la bermuda termine de cubrir las calles de los primeros nueve hoyos.

Se usarán, tal y como se hizo durante la reforma de los primeros nueve hoyos, dos posiciones de tee para todos aquellos socios que quieran jugar dos veces los segundos nueve durante los días de cierre de los primeros nueve.

 Les mantendremos informados al respecto. 

Junta Directiva
RCG Las Brisas


Update: Necessary Course Maintenance



Dear Members,

We want to keep you informed of our plans for the continuing maintenance of the Las Brisas Golf Course.

Members, who have been at the club over the recent summer months, will, like us, have been very disappointed with the ryegrass seeding to the rough areas, and, also following the refurbishment, the recovery of the Bermuda grass fairways (especially holes 2 and 3 and 8).

There is no reason to believe that this year has had adverse exceptional circumstances, and, while we expect course conditions in the coming weeks to improve greatly due to the September over seeding, it is recognised that something has to be done to ensure sustainable, year round quality.

For the front nine fairways, the proposed solution is to repair and sod with Bermuda grass fairways 1, 2, 3 and 8 during September.

For the rough areas, we are planning a two-step killing process of the remaining grasses (kikuyu and ryegrass) so that the new seeding has the maximum opportunity to germinate and that the future grass cover is uniform and, more importantly, free of weed. The seeding is planned to happen in mid-September; the grass that has been chosen and tested is “Tall Fescue” grass that is much more tolerant to our climate, soil and water conditions. This grass has also been proven in courses like, RCG El Prat, PGA of Catalunya, RC de Pineda, and Santana Golf.  We are expecting germination two weeks after seeding, and first mowings in the next two weeks after germination.

We would like to make you aware that:

·      During the first stage, Members will observe that the roughs will completely die off; germination of new seed will then follow.
·      Until germination, it is necessary to keep soils wet for 24 hours with continuous irrigation. You will find the course over irrigated in some areas and bare soil will incentivise puddles in some of the places.
·      Buggies will need to keep on the cart paths until a good establishment has occurred. This process could take  several weeks.

For the three operations (sodding of fairways, killing of roughs and seeding) to happen, we need to close front nine holes.  The calendar below shows the closure period for the front nine holes.


*Dates in red - front 9 hole closure.

In addition to these extra maintenance works, we will over seed roughs, with the same tall fescue grasses, on the back nine holes and all the fairways with “Poa Trivialis” from the beginning of October; this will give another extra 2 weeks for the Bermuda to cover on the fairways of the front nine holes.

Two tee positions will be placed on the Back Nine for those Members who would like to play the back nine twice during the closure of the front nine.

We will continue to keep you informed of progress.

Executive Committee,
Real Club de Golf Las Brisas