4 ABR - 6 ABR

domingo, 16 de marzo de 2025


WORKS IDENTIFIED BY MAINTENANCE DEPARTMENT TO BE ACCOMPLISHED IN THE NEAR FUTURE

Red: in process. Green: completed

 

PRIORITY

 

Raise low drains and irrigation boxes

1

 

Edging woodchip areas

1

 

Repair entrance to lake 8 from SGA

1

 

Edge cart path

1

 

Install stone gutter at 6 lake

1

 

Transitioning Zoysia collars on putting greens

3

 

Install sleepers in bark area 1-9

3

 

Repain rubber pavement in bridges

3

 

Paint pump house floor

3

 

Repair drain at 14th tee

 

Clean drains

 

Repain drain left side of hole 9

 

Drain 9/Driving Range

 

 

 

FLOWERS:

 

Prune at green wall

1

 

Clean plants at chiringuito

1

 

Fix esparteras between tee and 12th fairway

2

 

Cut dead palm trees

2

 

Lentiscos in corner 2

3

 

Prune yucas at 10

3

 

Plant trees at 18

 

New bushes on lakes 1,6,7,8

 

Prune trees at parking area

 

 

 

FURNITURE:

 

Install provisional handrail in bunker 11 and 17. Find final solution

1

 

Install new sand boxes in SGA and tee 10

1

 

install RCG Las Brisas billboards permanent anchors

2

 

Paint wooden bridge 17

3

 

Painting wooden handrail 18

3

 

Install new liters

 

Install new tee sign