11 FEB - 12 FEB

domingo, 19 de enero de 2025

WORKS IDENTIFIED BY MAINTENANCE DEPARTMENT TO BE ACCOMPLISHED IN THE NEAR FUTURE

Red: in process. Green: completed

PRIORITY

Raise low drains and irrigation boxes

1

Edging woodchip areas

1

Drain 9/Driving Range

1

Repain drain left side of hole 9

1

Clean drains

1

Repair entrance to lake 8 from SGA

2

Edge cart path

2

Transitioning Zoysia collars on putting greens

3

Install sleepers in bark area 1-9

3

Repain rubber pavement in bridges

3

Install stone gutter at 6 lake

3

Review and clean satellites

Review tee contour

Staples to reinforce signing

Clean sprinklers

FLOWERS:

Prune at green wall

1

Clean plants at chiringuito

1

Fix esparteras between tee and 12th fairway

2

Cut dead palm trees

2

Lentiscos in corner 2

3

Plant trees at 18

New bushes on lakes 1,6,7,8

Prune trees at parking area

Prune olive trees

FURNITURE:

Install handrail in bunker 11 and 17

1

Install new sand boxes in SGA and tee 10

1

install RCG Las Brisas billboards permanent anchors

2

Paint wooden bridge 17

3

Painting wooden handrail 18

3

Install new liters

Install new tee sign