WORKS IDENTIFIED BY MAINTENANCE DEPARTMENT TO BE ACCOMPLISHED IN THE NEAR
FUTURE | ||
Red:
in process. Green: completed | ||
PRIORITY | ||
Raise
low drains and irrigation boxes | 1 | |
Edging
woodchip areas | 1 | |
Drain
9/Driving Range | 1 | |
Repain drain left side of hole 9 | 1 | |
Clean drains | 1 | |
Repair
entrance to lake 8 from SGA | 2 | |
Edge cart path | 2 | |
Transitioning Zoysia collars on putting greens | 3 | |
Install sleepers in bark area 1-9 | 3 | |
Repain rubber pavement in bridges | 3 | |
Install stone gutter at 6 lake | 3 | |
Review and clean satellites | ||
Review tee contour | ||
Staples to reinforce signing | ||
Clean sprinklers | ||
FLOWERS: | ||
Prune
at green wall | 1 | |
Clean plants at chiringuito | 1 | |
Fix esparteras between tee and 12th fairway | 2 | |
Cut dead palm trees | 2 | |
Lentiscos in corner 2 | 3 | |
Plant trees at 18 | ||
New bushes on lakes 1,6,7,8 | ||
Prune trees at parking area | ||
Prune olive trees | ||
FURNITURE: | ||
Install
handrail in bunker 11 and 17 | 1 | |
Install
new sand boxes in SGA and tee 10 | 1 | |
install RCG Las Brisas billboards permanent anchors | 2 | |
Paint wooden bridge 17 | 3 | |
Painting wooden handrail 18 | 3 | |
Install new liters | ||
Install new tee sign |