WORKS IDENTIFIED BY
MAINTENA+B1:D36NCE DEPARTMENT TO BE ACCOMPLISHED IN THE NEAR FUTURE |
||
Red: in process. Green: completed |
||
PRIORITY |
||
Clean
sprinklers |
1 |
|
Raise low drains and
irrigation boxes |
1 |
|
Staples
to reinforce signing |
1 |
|
Edging
woodchip areas |
1 |
|
Review
tee contour |
1 |
|
Review
and clean satellites |
2 |
|
Drain 9/Driving Range |
2 |
|
Transitioning Zoysia collars
on putting greens |
3 |
|
Install sleepers in bark
area 1-9 |
3 |
|
Raise sleepers at 15-12 path |
||
Repair gully on 8th tee
(from path to lake) |
||
Repair municipal waist
system at 6 |
||
Mow steep banks 1,3,6,7,8,11,12,16,17 |
||
Clean bark areas |
||
FLOWERS: |
||
Prune
at green wall |
1 |
|
Plant
trees at 18 |
1 |
|
New
bushes on lakes 1,6,7,8 |
1 |
|
Prune trees at parking area |
2 |
|
Fix esparteras between tee
and 12th fairway |
2 |
|
Lentiscos in corner 2 |
3 |
|
Prune palm trees |
||
Plant trees at 1 |
||
FURNITURE: |
||
Install
new tee sign |
1 |
|
Install new liters |
1 |
|
install RCG Las Brisas
billboards permanent anchors |
2 |
|
Paint wooden bridge 17 |
3 |
|
Painting wooden handrail 18 |
3 |
|
Install bases for forniture
at driving range |
||
Clean and paint putting
green wooden flags |