WORKS IDENTIFIED BY MAINTENANCE DEPARTMENT TO BE ACCOMPLISHED IN THE NEAR
FUTURE |
||
|
Red:
in process. Green: completed |
||
|
PRIORITY |
||
|
Raise
low drains and irrigation boxes |
1 |
|
|
Staples
to reinforce signing |
1 |
|
|
Clean
bark areas |
1 |
|
|
Edging
woodchip areas |
1 |
|
|
Review and
clean satellites |
2 |
|
|
Repair
municipal waist system at 6 |
1 |
|
|
Review tee
contour |
1 |
|
|
Mow steep
banks 1,3,6,7,8,11,12,16,17 |
1 |
|
|
Raise
sleepers at 15-12 path |
1 |
|
|
Transitioning Zoysia collars on putting greens |
3 |
|
|
Drain 9/Driving Range |
3 |
|
|
Install sleepers in bark area 1-9 |
3 |
|
|
Wash salts in bad areas |
||
|
Wash salts in tees |
||
|
Apply chlorine to control algae on bunkers |
||
|
Plant SGA green 1 with bermuda |
||
|
Gypsum application on roughs and fairways |
||
|
Scalp roughs prior to maintenance week |
||
|
Set-up protocole |
||
|
FLOWERS: |
||
|
Prune
at green wall |
1 |
|
|
Plant
trees at 1 and 18 |
1 |
|
|
Add
woodchip |
1 |
|
|
Fix esparteras between tee and 12th fairway |
2 |
|
|
Change flowers on tee 3 |
3 |
|
|
Lentiscos in corner 2 |
3 |
|
|
Prune yucas |
||
|
Plant tree at 5 |
||
|
Add plants on Green Wall |
||
|
Cut dead palms |
||
|
FURNITURE: |
||
|
install RCG Las Brisas billboards permanent anchors |
2 |
|
|
Paint wooden bridge 17 |
3 |
|
|
Painting wooden handrail 18 |
3 |
|
|
Clean and paint putting green wooden flags |
||