WORKS IDENTIFIED BY
MAINTENANCE DEPARTMENT TO BE ACCOMPLISHED IN THE NEAR FUTURE |
||
Red: in process. Green: completed |
||
PRIORITY |
||
Review
and clean satellites |
1 |
|
Raise
low drains and irrigation boxes |
1 |
|
Staples
to reinforce signing |
1 |
|
Clean
bark areas |
1 |
|
Review
tee contour |
1 |
|
Scalp
roughs prior to maintenance week |
1 |
|
Repair
municipal waist system at 6 |
1 |
|
Set-up
protocole |
1 |
|
Wash salts in bad areas |
1 |
|
Mow steep
banks 1,3,6,7,8,11,12,16,17 |
1 |
|
Raise
sleepers at 15-12 path |
1 |
|
Edging
woodchip areas |
2 |
|
Transitioning Zoysia collars on putting greens |
3 |
|
Drain 9/Driving Range |
3 |
|
Install sleepers in bark area 1-9 |
3 |
|
Apply chlorine to control algae on bunkers |
||
Vertidrain bare patches on fairways (deep tining) |
||
Apply Hydrogen Peroxide on bare patches on fairways |
||
Aerify Pg at cafetería |
||
FLOWERS: |
||
Prune
at green wall |
1 |
|
Prune
yucas |
1 |
|
Plant tree at 5 |
1 |
|
Add woodchip |
2 |
|
Fix esparteras between tee and 12th fairway |
2 |
|
Change flowers on tee 3 |
3 |
|
Lentiscos in corner 2 |
3 |
|
Plant trees at 18 |
3 |
|
Add plants on Green Wall |
||
Cut dead palms |
||
FURNITURE: |
||
install RCG Las Brisas billboards permanent anchors |
2 |
|
Paint wooden bridge 17 |
3 |
|
Painting wooden handrail 18 |
3 |
|
Clean and paint putting green wooden flags |