20 DIC - 23 DIC

domingo, 16 de junio de 2024

 

WORKS IDENTIFIED BY MAINTENANCE DEPARTMENT TO BE ACCOMPLISHED IN THE NEAR FUTURE

Red: in process. Green: completed

PRIORITY

Review and clean satellites

1

Raise low drains and irrigation boxes

1

Staples to reinforce signing

1

Clean bark areas

1

Review tee contour

1

Scalp roughs prior to maintenance week

1

Repair municipal waist system at 6

1

Set-up protocole

1

Wash salts in bad areas

1

Mow steep banks 1,3,6,7,8,11,12,16,17

1

Raise sleepers at 15-12 path

1

Edging woodchip areas

2

Transitioning Zoysia collars on putting greens

3

Drain 9/Driving Range

3

Install sleepers in bark area 1-9

3

Apply chlorine to control algae on bunkers

Vertidrain bare patches on fairways (deep tining)

Apply Hydrogen Peroxide on bare patches on fairways

Aerify Pg at cafetería

FLOWERS:

Prune at green wall

1

Prune yucas

1

Plant tree at 5

1

Add woodchip

2

Fix esparteras between tee and 12th fairway

2

Change flowers on tee 3

3

Lentiscos in corner 2

3

Plant trees at 18

3

Add plants on Green Wall

Cut dead palms

FURNITURE:

install RCG Las Brisas billboards permanent anchors

2

Paint wooden bridge 17

3

Painting wooden handrail 18

3

Clean and paint putting green wooden flags