WORKS IDENTIFIED BY MAINTENANCE DEPARTMENT TO BE ACCOMPLISHED IN THE NEAR
FUTURE
|
Red:
in process. Green: completed
|
|
|
|
PRIORITY
|
|
Review
and clean satellites
|
1
|
|
Raise
low drains and irrigation boxes
|
1
|
|
Staples
to reinforce signing
|
1
|
|
Vertidrain
bare patches on fairways (deep tining)
|
1
|
|
Clean
bark areas
|
1
|
|
Review
tee contour
|
1
|
|
Apply
chlorine to control algae on bunkers
|
1
|
|
Scalp
roughs prior to maintenance week
|
1
|
|
Wash salts in bad areas
|
1
|
|
Mow steep
banks 1,3,6,7,8,11,12,16,17
|
1
|
|
Raise
sleepers at 15-12 path
|
1
|
|
Repair
municipal waist system at 6
|
1
|
|
Set-up protocole
|
2
|
|
Edging
woodchip areas
|
2
|
|
Transitioning Zoysia collars on putting greens
|
3
|
|
Drain 9/Driving Range
|
3
|
|
Install sleepers in bark area 1-9
|
3
|
|
Apply Hydrogen Peroxide on bare patches on fairways
|
|
|
Aerify Pg at cafetería
|
|
|
|
|
|
FLOWERS:
|
|
|
Prune
at green wall
|
1
|
|
Prune
yucas
|
1
|
|
Plant tree at 5
|
1
|
|
Add woodchip
|
2
|
|
Fix esparteras between tee and 12th fairway
|
2
|
|
Change flowers on tee 3
|
3
|
|
Lentiscos in corner 2
|
3
|
|
Plant trees at 18
|
3
|
|
Add plants on Green Wall
|
|
|
Cut dead palms
|
|
|
|
|
|
FURNITURE:
|
|
|
install RCG Las Brisas billboards permanent anchors
|
2
|
|
Paint wooden bridge 17
|
3
|
|
Painting wooden handrail 18
|
3
|
|
Clean and paint putting green wooden flags
|
|
|