.

3 ABR - 4 ABR

lunes, 31 de marzo de 2025

 SEMANA DEL 31 MARZO AL 7 ABRIL

·       CALLE PRACTICAS: SIEGA JUEVES. ABIERTO A LAS 8:00

·       VERTICUT DE GREENES TARDE DEL MARTES

·       ABONO DE CALLES Y ROUGH (NUEVE SEGUNDOS) TARDE DEL MIERCOLES

·       REPARACION DAÑOS EN CALLES: REVISION GENERAL

·       PODA DE RAMAS

·       INSTALACION DE VAGUADAS EN HOYO 5/8

·       MOLDEO EN NUEVO TEE LINE EN CALLE DE PRACTICAS

·       LIMPIEZA GENERAL TRAS LLUVIAS INTENSAS: ZONAS NATURALIZADAS

 

DISCULPEN LAS MOLESTIAS

 

WEEK FROM MARCH 31 TO APRIL 7

·       PRACTICE AREA: MOWING ON THURSDAY. OPEN AT 8:00

·       GREEN VERTICUT TUESDAY EVENING

·       ROUGH AND FAIRWAYS FERTILIZATION (BACK NINE) WEDNESDAY EVENING

·       REPAIR OF DAMAGES DUE TO SALINITY. OVERALL REVISION

·       TREE PRUNING

·       INSTALLATION OF DITCHES IN HOLE 5/8

·       SHAPING AROUND NEW TEE LINE IN DRIVING RANGE

·       GENERAL CLEANUP AFTER HEAVY RAIN: WASTE AREAS

 

WE APOLOGIZE FOR THE INCONVENIENCE

lunes, 24 de marzo de 2025

SEMANA DEL 24 DE MARZO AL 31 MARZO

·       MAÑANA DEL LUNES CAMPO CERRADO:

o   REFORMA TEE 10 Y 11

o   ARADO DE BUNKERS

o   REPARACION DE TEPES GREEN 2

o   TALA DE PALMERAS MUERTAS

o   REPARACION DE DAÑOS POR LLUVIA

·       CALLE DE PRACTICAS: SIEGA EL JUEVES. ABIERTO A LAS 8:00

·       PERFILADO DE ZONAS NATURALIZADAS

·       TRABAJOS DE ARBORISTA: PODA DE RAMAS

·       TRABAJOS DE REFORMA TEE 10 Y 11

·       RASTRILLADO DE ZONAS NATURALIZADAS TRAS LLUVIAS

DISCULPEN LAS MOLESTIAS

 

WEEK FROM MARCH 24 TO MARCH 31

·       COURSE CLOSED MONDAY MORNING:

o   REFURBISHMENT OF TEE 10 AND 11

o   BUNKER DEEP PLOWING

o   REPAIR WITH SOD ON GREEN 2

o   REMOVAL OF DEAD PALMS

o   REPAIR OF DAMAGES FROM HEAVY RAIN

·       PRACTICE AREA: MOWING ON THURSDAY. OPEN AT 8:00

·       EDGING WASTE AREAS

·       ARBORIST WORK: TREE PRUNING

·       REFURBISHMENT ON TEE 10 AND 11

·       RAKING WASTE AREAS AFTER HEAVY RAIN

WE APOLOGIZE FOR THE INCONVENIENCE

lunes, 17 de marzo de 2025

SEMANA DEL 17 MARZO AL 24 MARZO

·       CALLE PRACTICAS: SIEGA JUEVES. ABIERTO A LAS 8:00

·       REPARACION DAÑOS EN CALLES: REVISION GENERAL

·       LIMPIEZA DE VIEJAS PLANTAS HERBACEAS

·       PODA DE RAMAS

·       INSTALACION DE VAGUADAS EN HOYO 5/8

·       LIMPIEZA GENERAL TRAS LLUVIAS INTENSAS

 

DISCULPEN LAS MOLESTIAS

 

WEEK FROM MARCH 17 TO MARCH 24

·       PRACTICE AREA: MOWING ON THURSDAY. OPEN AT 8:00

·       REPAIR OF DAMAGES DUE TO SALINITY. OVERALL REVISION

·       CLEANING OLD GRASSES ON WASTE AREAS

·       TREE PRUNING

·       INSTALLATION OF DITCHES IN HOLE 5/8

·       GENERAL CLEANUP AFTER HEAVY RAIN

 

WE APOLOGIZE FOR THE INCONVENIENCE

domingo, 16 de marzo de 2025


WORKS IDENTIFIED BY MAINTENANCE DEPARTMENT TO BE ACCOMPLISHED IN THE NEAR FUTURE

Red: in process. Green: completed

 

PRIORITY

 

Raise low drains and irrigation boxes

1

 

Edging woodchip areas

1

 

Repair entrance to lake 8 from SGA

1

 

Edge cart path

1

 

Install stone gutter at 6 lake

1

 

Transitioning Zoysia collars on putting greens

3

 

Install sleepers in bark area 1-9

3

 

Repain rubber pavement in bridges

3

 

Paint pump house floor

3

 

Repair drain at 14th tee

 

Clean drains

 

Repain drain left side of hole 9

 

Drain 9/Driving Range

 

 

 

FLOWERS:

 

Prune at green wall

1

 

Clean plants at chiringuito

1

 

Fix esparteras between tee and 12th fairway

2

 

Cut dead palm trees

2

 

Lentiscos in corner 2

3

 

Prune yucas at 10

3

 

Plant trees at 18

 

New bushes on lakes 1,6,7,8

 

Prune trees at parking area

 

 

 

FURNITURE:

 

Install provisional handrail in bunker 11 and 17. Find final solution

1

 

Install new sand boxes in SGA and tee 10

1

 

install RCG Las Brisas billboards permanent anchors

2

 

Paint wooden bridge 17

3

 

Painting wooden handrail 18

3

 

Install new liters

 

Install new tee sign

 

lunes, 10 de marzo de 2025

 SEMANA DEL 10 DE MARZO AL 17 MARZO

·       MAÑANA DEL LUNES CAMPO CERRADO:

o   REPASO DE CAMPO TRAS SEMANA MANTENIMIENTO

o   FERTILIZACION EN 9 SEGUNDOS

o   PERFILADO DE CAMINOS

o   ABONO DE TEPES EN CALLES

o   REFORMA TEE 10 Y 11

o   ARADO DE BUNKERS

·       CALLE DE PRACTICAS: SIEGA EL JUEVES. ABIERTO A LAS 8:00

·       PERFILADO DE ZONAS NATURALIZADAS

·       PODA DE RAMAS

·       TRABAJOS DE REFORMA TEE 10 Y 11

·       TERMINADO DE LIMPIEZA Y SIEGA TRAS LA SEMANA DE MANTENIMIENTO

DISCULPEN LAS MOLESTIAS

 

WEEK FROM MARCH 10 TO MARCH 17

·       COURSE CLOSED MONDAY MORNING:

o   COURSE CLEAN UP AFTER MAINTENANCE WEEK

o   BACK NINE FERTILIZATION

o   PATH EDGING

o   FERTILIZATION OF SOD ON FAIRWAYS

o   REFURBISHMENT OF TEE 10 AND 11

o   BUNKER DEEP PLOWING

·       PRACTICE AREA: MOWING ON THURSDAY. OPEN AT 8:00

·       EDGING WASTE AREAS

·       TREE PRUNING

·       REFURBISHMENT ON TEE 10 AND 11

·       FINAL CLEAN UP AND MOW AFTER MAINTENANCE WEEK

WE APOLOGIZE FOR THE INCONVENIENCE

lunes, 3 de marzo de 2025

SEMANA DEL 3 DE MARZO AL 10 DE MARZO

·       SEMANA DE MANTENIMIENTO

o   PINCHADO, VERTICUT Y RECEBO DE GREENES

o   PINCHADO Y RECEBO DE COLLARES Y TEES.

o   RECEBO DE ENTRADAS

o   TALA DE ARBOLES MUERTOS

o   PINCHADO DE CALLES LOCALIZADO

o   NIVELADO DE BUNKERS

o   TRATAMIENTO HERBICIDA GENERAL

o   ABONADO GENERAL

o   CONVERSION DE TEES DE AGROSTIS A LATITUDE

§  TEE 1 61, TEE 10 61, TEE 11 61

 

DISCULPEN LAS MOLESTIAS

 

WEEK FROM MARCH 3 TO MARCH 10

·       MAINTENANCE WEEK

o   TINING, VERTUCUT AND TOPDRESSING GREENS

o   TINING AND TOPDRESSING COLLARS AND TEES

o   TOPDRESSING APRONS

o   DEAD TREES CUT DOWN

o   LOCALIZED FAIRWAY TINING

o   CHECKING BUNKER SAND LEVELS

o   GENERAL HERBICIDE APPLICATION

o   GENERAL FERTILIZATION

o   TEE TRANSITION FROM BENTGRASS TO LATITUDE

§  TEE 1 61, TEE 10 61, TEE 11 61

 

WE APOLOGIZE FOR THE INCONVENIENCE